Operation and debugging of PCB shuttle conveyor
- Categories:Industry News
- Time of issue:2022-04-19 15:17
- Views:
(Summary description)The PCB shuttle conveyor should be installed on a fixed foundation according to the specified installation method. Before the mobile conveyor is officially running, the wheels should be wedged with triangular wood or braked with brakes.
Operation and debugging of PCB shuttle conveyor
- Categories:Industry News
- Time of issue:2022-04-19 15:17
- Views:
1. The PCB shuttle conveyor should be installed on a fixed foundation according to the specified installation method. Before the mobile conveyor is officially running, the wheels should be wedged with triangular wood or braked with brakes. In order to avoid walking during work, when there are multiple conveyors operating in parallel, there should be a one-meter channel between machines and between machines and walls.
2. Before using the PCB shuttle conveyor, it is necessary to check whether the running parts, the tape hasps and the carrying device are normal, and whether the protective equipment is complete. The tension of the tape must be adjusted to an appropriate level before starting.
3. The PCB shuttle conveyor should be started with no load. Wait until the operation is normal before feeding. It is forbidden to drive after feeding.
4. When there are several conveyors running in series, they should start from the discharge end and start sequentially. After all the normal operation, the material can be fed.
5. When the tape deviates during operation, it should be stopped and adjusted, and it should not be used reluctantly, so as not to wear the edge and increase the load.
6. The temperature of the working environment and the material being sent shall not be higher than 50℃ and lower than -10℃. Materials with acid-base oils and organic solvents are not allowed to be conveyed.
7. Pedestrians or passengers are prohibited on the PCB shuttle conveyor.
8. The feeding must be stopped before parking, and the parking can only be done after the material on the belt is unloaded.
9. The PCB shuttle conveyor motor must be well insulated. Do not pull and drag the mobile conveyor cables randomly. The motor should be grounded reliably.
10. When the belt slips, it is strictly forbidden to pull the belt by hand to avoid accidents.
CONTACT US
SHENZHEN HANSOME TECHNOLOGY CO.,LTD.
3rd Floor,Building A,Sha Tang Bei Fang Yong Fa Industrial Area,Sha Jing, Bao an, Shenzhen, China
E-mai: sales@hstech-smt.com
Tel: 86-755-23209382
Mob/WhatsApp: 86-18825230535 (24hrs)
Quick Contact HSTECH
Our team will feedback you in 2 hours
COPYRIGHT SHENZHEN HANSOME TECHNOLOGY CO.,LTD.